home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_570.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  20KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/EbFXKSK00VcJQDBk5G>;
  5.           Sun, 18 Nov 1990 02:17:51 -0500 (EST)
  6. Message-ID: <sbFXJuu00VcJEDA04y@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sun, 18 Nov 1990 02:17:15 -0500 (EST)
  12. Subject: SPACE Digest V12 #570
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 570
  15.  
  16. Today's Topics:
  17.            Re: Pity The Much Abused Shuttle
  18.           Re: CRAF/Cassini Update - 11/09/90
  19.                ELV Launch Loads
  20.              Re: LNLL Inflatable Stations
  21.           Re: Spectacular event over Europe
  22.              Galileo Update #2 - 11/16/90
  23.            Re: Pity The Much Abused Shuttle
  24.  
  25. Administrivia:
  26.  
  27.     Submissions to the SPACE Digest/sci.space should be mailed to
  28.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  29.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  30.              tm2b+@andrew.cmu.edu
  31.  
  32. ----------------------------------------------------------------------
  33.  
  34. Date: Fri, 16 Nov 1990 13:00-EST
  35. From: Barak.Pearlmutter@CS.CMU.EDU
  36. Subject: Re: Pity The Much Abused Shuttle
  37.  
  38. In regards to the comments by hydra!francis (Francis Vaughan):
  39.  
  40. > Just how proof to an air launched guided sat-killer missile do you think
  41. > the shuttle is? Sitting duck is the term that comes to mind. It can't even
  42. > run.
  43. > At boarding range a high velocity rifle could cripple the shuttle in
  44. > a minute. Just loose a few of those nice tiles in critical places and
  45. > its a goner on reentry. Let alone what would happen if you disabled
  46. > any of the host of critical systems. You could nearly kill the shuttle with
  47. > a slingshot and a well aimed rock.
  48.  
  49. Your "unable to run" argument is fallacious; putting propellant in the
  50. cargo bay and carrying it into orbit would make the shuttle extremely
  51. maneuverable.
  52.  
  53. I think you're overestimating the shuttle's vulnerability to light arms;
  54. I doubt a burst from an uzi would do any serious damage.  But in any
  55. case, doesn't your vulnerability argument apply to a Jeep too?  Jeeps
  56. are unarmored.  One shot from a pistol could disable a Jeep.  Yet for
  57. some reason Jeeps are useful military vehicles.
  58.  
  59. > " Is the satelite in the enemy shuttle cargo bay Igor?"
  60. >
  61. > "Yes Ivan"
  62. >
  63. > "Activate the self destruct Igor"
  64.  
  65. It would certainly be prudent to disable or jam an enemy satellite's
  66. communications facilities before bringing it aboard.
  67.  
  68. ------------------------------
  69.  
  70. Date: 16 Nov 90 18:27:37 GMT
  71. From: usc!cs.utexas.edu!news-server.csri.toronto.edu!utgpu!utzoo!henry@ucsd.edu  (Henry Spencer)
  72. Subject: Re: CRAF/Cassini Update - 11/09/90
  73.  
  74. I wrote:
  75. >...not a good place for solar power.  You have the usual annoying problem
  76. >of it being night half the time, but the real killer is the dust storms,
  77. >which can cut surface illumination to nearly zero for months at a time.
  78.  
  79. Some correspondence with folks in a position to know indicates that the
  80. latter is a bit of an overstatement.  There is still a fair bit of light,
  81. as it turns out, although it may well be inadequate for viable solar power.
  82. -- 
  83. "I don't *want* to be normal!"         | Henry Spencer at U of Toronto Zoology
  84. "Not to worry."                        |  henry@zoo.toronto.edu   utzoo!henry
  85.  
  86. ------------------------------
  87.  
  88. Date: 14 Nov 90 02:59:55 GMT
  89. From: swrinde!zaphod.mps.ohio-state.edu!usc!elroy.jpl.nasa.gov!zardoz.cpd.com!dhw68k!ofa123!Wales.Larrison@ucsd.edu  (Wales Larrison)
  90. Subject: ELV Launch Loads
  91.  
  92.  
  93.    Allan, you had asked for typical launch loads for different 
  94. launch vehicles.  The following data was produced from the vehicle 
  95. "User Handbooks" for a project looking at launching a payload on 
  96. different vehicles.  
  97.    Launch vehicle vibration induced accelerations are combined with 
  98. launch vehicle steady state accelerations to produce spacecraft 
  99. design load factors (i.e., accelerations that must be considered for 
  100. spacecraft structural design).  These load factors are a function of 
  101. both launch vehicle characteristics and spacecraft dynamics.  
  102. Therefore it is necessary to design the spacecraft so the dynamic 
  103. coupling between spacecraft and launch vehicle low frequency modes 
  104. is avoided.  Minimum lateral mode frequencies should be above 10 Hz.  
  105. Minimal axial mode frequencies differs for all ELVs (I didn't want 
  106. to transcribe several tables) and varies from 15 Hz for the Atlas to 
  107. 31 Hz for the Ariane. Note the following data includes no design 
  108. margins.  A margin of 1.4 is typical for design purposes. (Negative 
  109. indicates compression in axial loads - units in standard G's) 
  110.                           Axial           Lateral
  111.    Atlas                  -6/+2           -2/+2
  112.    Titan III              -7/+3         -2.5/+2.5
  113.    Titan IV             -6.5/+3         -3.5/+3.5
  114.    Delta II             -6.5/+0          -2.5/+2.5
  115.    Ariane IV              -7/+2.5        -2.5/+2.5
  116.    Proton                 -4/0             -3/+3
  117.    Shuttle                -3/+0          -1.0/+1.0
  118.    Shuttle Emergency    -3.5/+2.0        -3.7/+3.7  [1]
  119.  
  120.   Note [1].  Shuttle emergency lateral loads are driven for 
  121. emergency landings - assuming a heavy orbiter "slapping" down hard 
  122. on its landing gear and slamming on its brakes.  Normal, measured 
  123. landing G's are usually less than 0.5 G lateral and axial. 
  124.    Note [2].  ELVs also have to design to typical "pyro shock" load 
  125. of1500-2500 G/sec which occurrs when the explosive bolts on the 
  126. payload shroud separate, and more severely, when the pryo separation 
  127. devices go off to separate the payload from the ELV.  Shuttle 
  128. payloads typically use a spring system for separation from the 
  129. vehicle (IUS, PAM) or electrically driven latches (LDEF, Space 
  130. Telescope, SPAS, etc), or a combination of the two.  Shuttle pryo 
  131. shock levels during ascent are in the vicinity of 500 G/sec or less 
  132. from SRB and ET separation, which are intentionally attenuated or 
  133. dissipated through the structure. 
  134.    
  135.     Last set of random comments.  You could probably use an ELV for 
  136. launch, assuming you had a trained, willing and well-conditioned 
  137. young crew, and equipped the ELV with a launch escape tower. F-16 
  138. pilot trainees are centrifuge tested to 6 Gs for a period of a few 
  139. seconds, so 8 G's or so should be tolerable for few minutes ( Just 
  140. don't ask them to do much for an while afterwards....) 
  141.     Does anyone remember the loads imposed by the Apollo launch 
  142. escape system?  I remember the Gemini had very high-G ejection seats 
  143. (they were rumored to be a guarantee of back injury if used - and 
  144. were only to be used if the choice was quick death rather than slow 
  145. death).  How about the Mercury escape system loads?  Soyuz?  
  146.     Also, does anyone have any particulars on the "Little Joe" 
  147. program at White Sands which qualified the Apollo launch escape 
  148. system?  I seem to remember about a half-dozen or so suborbital 
  149. tests, including several failures.  Anybody have costs of that?
  150. ----------------------------------------------------------------
  151. Wales Larrison                        Space Technology Investor
  152.  
  153.  
  154.  
  155.  
  156. --  
  157. Wales Larrison
  158. Internet: Wales.Larrison@ofa123.fidonet.org
  159. Compuserve: >internet:Wales.Larrison@ofa123.fidonet.org
  160. --------------------------------------------------------------------------
  161.  
  162. ------------------------------
  163.  
  164. Date: 16 Nov 90 19:29:48 GMT
  165. From: rochester!sol!yamauchi@louie.udel.edu  (Brian Yamauchi)
  166. Subject: Re: LNLL Inflatable Stations
  167.  
  168. In article <9011161824.AA13862@iti.org> aws@ITI.ORG ("Allen W. Sherzer") writes:
  169.    In article <46667@eerie.acsu.Buffalo.EDU> you write:
  170.    >>>You would have little chance of retrieving something if it was
  171.    >>>dropped or came unhooked. 
  172.  
  173.    >>Depends on how valuable it was. I'm sure hand tools would be left but
  174.    >>astronauts would be retrieved.
  175.  
  176.    >Correct me if I'm wrong, but the astronauts (and tools) would be
  177.    >awfully hard to catch up to to bring back.
  178.    >
  179.    >[calculations showing astronaut flying away at 50ft/sec deleted]
  180.  
  181.    These numbers look good to me. I guess we will need to tie him to
  182.    the ladder :-).
  183.  
  184. I suppose you could use clamps like the ones mountain climbers use to
  185. attach themselves to their lines.  Of course, it would still be
  186. possible to fall while moving.
  187.  
  188.    I was thinking we could save weight by using an
  189.    umbilical to connect the astronaut to the life support system. Perhaps
  190.    we can make the umbilical strong enough to support him/her should
  191.    they fall off.
  192.  
  193. My guess would be that such an umbilical would be much too cumbersome.
  194. You would also have to worry about getting the line snagged on
  195. something and developing a tear.
  196.  
  197.    >I really do like the idea of a spun station, but either:
  198.    >      a) despin the station for EVAs or
  199.    >      b) give the astronauts MMU's to get back!
  200.  
  201.    I think MMU's would be out of the question. They would weigh too
  202.    much at the lower levels. Also, MMU's require too much maintenance.
  203.  
  204.    How about bungey cords like the kind they use to jump off bridges?
  205.  
  206. Yow!  All sorts of bad cartoon images spring to mind :-).  The
  207. astronaut playing "snap the whip" with the station (and losing).  The
  208. astronaut being slammed from one module to another like a giant paddle
  209. ball.  The astronaut's cord getting tangled around the hub and the
  210. astronaut spiraling in, in smaller and faster circles until *SPLAT*.
  211.  
  212. A better idea might be to use something like the EVA Retriever being
  213. developed for Freedom.  This is a robot which is designed to pick up
  214. things that fall off the station -- like tools and astronauts.  The
  215. advantage is that it can be deployed immediately to fetch the target
  216. -- you don't have to wait for another astronaut to suit up.  It uses a
  217. modified MMU, but at least you only need one, and weight is not a
  218. factor since (1) it's a robot and (2) it can stay at the hub until it
  219. is needed.
  220. --
  221. _______________________________________________________________________________
  222.  
  223. Brian Yamauchi                University of Rochester
  224. yamauchi@cs.rochester.edu        Computer Science Department
  225. _______________________________________________________________________________
  226.  
  227. ------------------------------
  228.  
  229. Date: 16 Nov 90 11:24:31 GMT
  230. From: mcsun!unido!mpirbn!p515dfi@uunet.uu.net  (Daniel Fischer)
  231. Subject: Re: Spectacular event over Europe
  232.  
  233. In article <816@obs.unige.ch> pfenniger@obs.unige.ch writes:
  234. >A spectacular event occurred on Nov. 5, around 18h UT (19h local time) over a
  235. >large part of western Europe.  Something similar to a big meteorite or
  236. >satellite atmospheric reentry has been observed by thousands of people [...]
  237. >Could someone with connection to NASA, NORAD tells if the satellite hypothesis
  238. >can be rejected ?  Such a large orbiting object should have been tracked.[...]
  239.  
  240. It *was* a reentry: NORAD has distributed the news that the event was caused by
  241. the reentry & burnup of the upper stage of the rocket that carried the Soviet
  242. comsat GORIZONT 21 into orbit on 3 October. Experienced observers on the ground
  243. had guessed that fact already from the long duration of the phenomenon, 2 to 3
  244. minutes: even a really big meteor (like the one from 1972 or the recent Euro-
  245. meteor from Sept.1986) crosses the sky in a few seconds.
  246.  
  247.   [Sources: communication with D.Heinlein, Europ. Net for Meteor Cameras + AP]
  248.  
  249. ------------------------------
  250.  
  251. Date: 16 Nov 90 21:55:14 GMT
  252. From: csus.edu!wuarchive!usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@ucdavis.ucdavis.edu  (Ron Baalke)
  253. Subject: Galileo Update #2 - 11/16/90
  254.  
  255.  
  256.                           GALILEO STATUS REPORT
  257.                             November 16, 1990
  258.  
  259.      As of noon (PST) Thursday, November 15, 1990, the Galileo spacecraft is
  260. 11,584,870 miles from the Earth and traveling at a heliocentric speed of
  261. 60,140 miles per hour; distance to the Sun is 101,784,750 miles (1.09 AU).
  262. Round trip light time is 2 minutes, 8 seconds.
  263.  
  264.      The sequence commanded flushing maneuver is in process as planned.  This
  265. is the 21st flushing maneuver executed since launch. Later today the
  266. spacecraft will execute a sun pointing maneuver of approximately 12.5 degrees.
  267.  
  268.      A non-interactive command was sent on November 9 to reset the EPD
  269. (Energetic Particles Detector) LEMMS detector threshold to its normal low
  270. setting.  The previous day, the threshold was increased in response to high
  271. noise counts.  Subsequent monitoring of the detector performance indicated
  272. proper operation and allowed a safe return to the lower threshold setting.
  273.  
  274.      A special EUV (Extreme Ultraviolet Spectrometer) memory readout was
  275. performed on November 10 in response to anomalous operation observed after
  276. commanding the instrument to the encounter mode.  The MRO (Memory Read Out)
  277. revealed two bits of a single byte were corrupted.  The memory corruption is
  278. similar to that observed during last December's 4-day science checkout
  279. although at a different memory location.  The latest anomaly was recreated
  280. and verified on the EUV simulator at the University of Colorado.  The cause
  281. of this EUV anomaly and the previous December anomaly is being investigated
  282. vigorously.  Commands were sent on November 13 to "patch" the corrupted
  283. memory location and reset it to its proper state compatible with Earth
  284. encounter data collection and proper instrument operation was restored.
  285.  
  286.      A NO-OP command was sent on November 12 to reset the Command Loss Timer
  287. to 216 hours, the planned value for this mission phase.
  288.  
  289.      The TCM-7 (Trajectory Course Maneuver) sequence memory load was
  290. successfully transmitted to the spacecraft on November 12.  The spacecraft
  291. properly executed the maneuver on November 13.  The maneuver was comprised of
  292. one axial segment and one lateral segment.  Spacecraft performance
  293. throughout the maneuver activity was excellent.  The RPM (Retro Propulsion
  294. Module) tank pressure and thruster temperatures were near predicted levels;
  295. temperatures were similar to those observed in TCM-6.  No spin rate correction
  296. was required between the axial and lateral burn segments or at the end of the
  297. maneuver activity.  Attitude pointing perturbation was minimal beginning at
  298. about 5 mrad and growing to almost 8 mrad after the axial segment.  This
  299. pointing error was corrected with a sequence planned pointing correction to
  300. near 0.5 mrad.  The lateral burn segment produced about 0.8 mrad of attitude
  301. pointing perturbation, well below the 2 mrad threshold, and consequently the
  302. sequence planned pointing correction was not performed.  Preliminary radio
  303. frequency navigation data indicates an axial and lateral overburn of about one
  304. percent which is near pre-maneuver execution predictions.
  305.  
  306.      Four delta DOR (Differential One-way Ranging) navigation activities were
  307. completed this week - two on November 12 and two on November 15.  The
  308. delta DOR activities were successful.  A total of 23 of the planned 27 delta
  309. DOR activities are complete; 19 were successful.
  310.  
  311.      The PPR (Photopolarimiter Radiometer) instrument was powered on November
  312. 14.  Instrument operation is normal; power and thermal profiles are within
  313. predicted levels.  The PPR calibration scheduled for this morning was completed
  314. as planned.  There were no unexpected events; data is being analyzed.
  315.  
  316.      The AC bus imbalance measurement dropped about 2 DN (.4 volt) and is
  317. stable near 48.2 volts.  DC bus measurement is presently reading about 2 volts.
  318. Both AC and DC changes occurred during periods of no spacecraft load
  319. switching.  Very little (1-2 DN) AC/DC bus measurement change was observed
  320. during the TCM-7 execution.  All other power-related and spacecraft telemetry
  321. measurements are normal.
  322.  
  323.      The final Project GDS (Ground Data Systems) test for Earth 1 was
  324. successfully completed with the Canberra 34 meter and 26 meter stations on
  325. November 13.  A key objective was met with the successful test of the probe
  326. data flow from the tracking station to the Probe Flight Operations Equipment
  327. (PFOE) in the Galileo Mission Support Area (MSA).  This link is required to
  328. support the Probe checkout scheduled for December 4th.  GDS testing has now
  329. validated all GDS functions required for Earth 1 support.
  330.  
  331.      The DSN (Deep Space Network) and Project Flight Team personnel
  332. participated in a "walk-through" rehearsal of the Earth Closest Approach
  333. (ECA) operations on November 15th.  During the review several minor changes
  334. to the sequence of events were suggested and accepted by the Flight Control
  335. and Support Office.  This walk-through will be repeated next week.
  336.  
  337.      The LGA-2 (Low Gain Antenna-2) retraction and HGA (High Gain Antenna)
  338. deployment reviews were held on November 14 and 15, respectively.  No
  339. concerns/discrepancies were identified by the review board between expected
  340. flight conditions and ground test data.  Expected flight conditions are well
  341. within the ground test database.
  342.       ___    _____     ___
  343.      /_ /|  /____/ \  /_ /|
  344.      | | | |  __ \ /| | | |      Ron Baalke         | baalke@mars.jpl.nasa.gov
  345.   ___| | | | |__) |/  | | |___   Jet Propulsion Lab | baalke@jems.jpl.nasa.gov
  346.  /___| | | |  ___/    | |/__ /|  M/S 301-355        |
  347.  |_____|/  |_|/       |_____|/   Pasadena, CA 91109 |
  348.  
  349. ------------------------------
  350.  
  351. Date: 16 Nov 90 21:02:57 GMT
  352. From: mojo!SYSMGR%KING.ENG.UMD.EDU@mimsy.umd.edu  (Doug Mohney)
  353. Subject: Re: Pity The Much Abused Shuttle
  354.  
  355. In article <658778464.bap@F.GP.CS.CMU.EDU>, Barak.Pearlmutter@CS.CMU.EDU writes:
  356.  
  357. >Your "unable to run" argument is fallacious; putting propellant in the
  358. >cargo bay and carrying it into orbit would make the shuttle extremely
  359. >maneuverable.
  360.  
  361. And a bigger target. Remember, you *have* to open the cargo bay doors in orbit
  362. (All that internal heat which needs to be radiated. Of course this makes a
  363. wonderful signature for an IR homer missile, personified by several cheap,
  364. light-weight models in your choice of man-portable or luggable by spacecraft).
  365. Now, you could armor your extra propellant tanks (which, by the way, they are
  366. JUST getting qualified to even put into the system), but armor is weight.
  367. Weight is bad if you are putting something into orbit.
  368.  
  369. >I think you're overestimating the shuttle's vulnerability to light arms;
  370. >I doubt a burst from an uzi would do any serious damage.  But in any
  371. >case, doesn't your vulnerability argument apply to a Jeep too?  Jeeps
  372. >are unarmored.  One shot from a pistol could disable a Jeep.  Yet for
  373. >some reason Jeeps are useful military vehicles.
  374.  
  375. Wrong Bbbbbuck. Shooting out the windshield on a jeep results in lots of glass
  376. and maybe you might kill someone. If you're Rambo, you dive out of the jeep,
  377. tastefully tuck-and-roll, then return fire. If the windshield of the shuttle
  378. gets shot out, and you don't happen to be wearing a space suit, you suck
  379. vaccuum. Should you be so fortunate enough to get into a space suit,
  380. Ivan-the-Terrible has now boarded the shuttle to finish the job he started. 
  381.  
  382. But, hey, why use GUNS. A couple of handfuls of BBs or gravel (preferably
  383. gravel, it won't show on radar) dropped into the orbital flight path and <poof>
  384. major damage to the system... If you're real lucky, you get a hit on the nice
  385. hydrozene tanks, thereby blowing a big hole in the bird when it goes up and
  386. generally assuring you are going to do some hitchhiking.
  387.  
  388. >It would certainly be prudent to disable or jam an enemy satellite's
  389. >communications facilities before bringing it aboard.
  390.  
  391. Sure. So what do you do when the Soviets declare war when you pick up their
  392. satellite? Shuttle orbital flight-paths are carefully tracked by their version
  393. of NORAD, and if one intersects with Spy-Sputnik, followed by Spy-Sputnik
  394. going off-line, don't you think someone might suspect something? 
  395.  
  396. Then the Soviets, determined to ruin your day, launch an SS-9 with ASAT warhead
  397. (or more probably something they have tucked away for a rainy day with solid
  398. fuel) and within 3-4 orbits turn the Rambo-Shuttle into scrap metal.
  399.  
  400. ------------------------------
  401.  
  402. End of SPACE Digest V12 #570
  403. *******************
  404.